INTERMODAL TERMINAL DECISION INTELLIGENCE

Before you commit.
Know what changes.

Building a terminal? Buying another machine? Changing your yard or gate operations? First ask what each alternative will actually deliver — and what it will cost.

What you buy: an evidence-led comparison and a recommendation your management team can challenge. Not a software licence. Displayed operating results come from executed engine runs on synthetic inputs, not customer data.

CONCEPTUAL TERMINAL SYSTEMDESIGN / FLOW / OPERATIONS
RAIL ACCESS YARD / STORAGE BLOCKS PARKING GATE Trucks · Machines · Trains · Containers
5decision areas
21study questions
3demand scenarios
For investors & boardsWhich terminal concept warrants detailed engineering and investment?
For terminal directorsWhat operational change should happen before buying more equipment?
For operations teamsWhere does throughput, access or recovery start to fail?
START HERE / A decision worth testing

Which decision are you being asked to approve?

Choose one live management dilemma. We will show the questions a serious study must answer, the minimum starting information and the decision-ready output you should expect.

BOARDROOM QUESTIONWhat would change our decision — and what evidence would convince us?
YOUR POTENTIAL DECISION STUDY

Terminal concept review

Which layout can meet the required flow with a defensible equipment concept?

COMPARE

2–3 feasible layouts under a common demand and service target.

START WITH

Indicative daily/peak flows, site constraints and planned equipment.

BOARD-READY OUTPUT

Alternatives, capacity bottlenecks, cost drivers, sensitivities and the next engineering decision.

A focused study is scoped to actual data and model coverage. No outcome, savings or implementation result is guaranteed.

Request a tailored study outline ↗

Opens a pre-filled email. No registration or confidential operational data required at this stage.

OPEN SELF-SERVICE DEMO / NO ACCOUNT REQUIRED

Don't just read the results. Explore what goes into them.

Explore three example yard sizes and seven previously executed configurations. Cases at 100/200 requests use uniform arrivals and two machines; the 500-request comparison uses mixed peak arrivals and three machines. Documented weights let you inspect matching saved policy experiments.

The demo shows how input choices affect available evidence. For prepared cases it provides an executive PDF and the engine-produced detailed Excel. For other settings, it offers a tailored study on your data.

Evidence standard: prepared demo reports come from completed terminal_sim-LM runs on synthetic example inputs; the examples are not calibrated forecasts for your terminal. Fresh calculations use a short necessary browser session and a private seven-day job/report retention period; ordinary service access logs may also exist. No account or confidential company data is requested.

What you can do in the pilot
  • Three standard layout presets: small, medium, large
  • 100, 200 or 500 containers per day
  • Uniform vs intensive mixed flows
  • Two machines at 100/200; three at 500
  • Adjust documented slot-scoring weights
  • Download a board brief and detailed data workbook
Try the open demo ↗ No sign-up · Prepared examples · Guarded live simulation · Private source code
ACTUAL ENGINE EXECUTION · SYNTHETIC EXAMPLE TERMINALS
100 / 200 / 500 requests per day. Sometimes the answer is: not enough.

Our example at 500 daily requests and 3 machines completed only 279–287 by the day-end deadline, depending on the yard layout. Your site could be different. We can model the decision with your own data.

Explore engine results ↗
01 / The decisions we help examine

Five questions worth answering before you act.

From the first drawing of a terminal to the last truck leaving the gate: every operating choice creates a trade-off. We structure the question, compare realistic alternatives and explain the consequences.

01 / BEFORE YOU BUILD

Is this the right terminal to construct?

Yard geometry, tracks, circulation routes, storage zones and equipment concepts tested against a common operating requirement.

Business outcome
Prioritise designs for detailed engineering.
02 / BEFORE YOU EXPAND

More equipment — or better allocation?

Test demand growth, fleet decisions, peak schedules and the operating costs behind each alternative.

Business outcome
Identify investments that merit closer scrutiny.
03 / WHEN EQUIPMENT FAILS

How quickly can the operation recover?

Analyse disrupted capacity, accumulating work and the limits of recovery measures.

Business outcome
Plan recovery rather than improvising it.
04 / BEFORE YOU CHANGE THE RULES

Could the same infrastructure work better?

Compare placement, dispatching and handling policies, including unproductive moves and resource use.

Business outcome
Discover potential value without expansion.
05 / FROM GATE TO YARD

Where does the journey become a queue?

Road gate capacity, pre-advice, truck parking, driver identity and communication, and the rail arrival interface.

Business outcome
Design smoother, more predictable access.
02 / Executed engine examples

Inspect the evidence.
Change the example.

Explore seven completed simulations of synthetic terminals: 100, 200 and 500 daily requests, three layouts at 500 requests, and two policy experiments. Each available configuration links to its original PDF and Excel report. A new selection never starts a new calculation.

Open the full interactive demo ↗
From a chart to an investment decision

A daily target is not the same as deliverable capacity.

Consider an example facility presented with 500 containers/day. Under identical 500-request conditions, sample yard layouts produce different completed volumes. These are engine outputs on synthetic inputs, not predictions for your site.

Actual engine run · Synthetic sample data500 containers/day target
Small279 in day221 not in day
Medium287 in day213 not in day
Large280 in day220 not in day

Results obtained from terminal_sim-LM on synthetic test conditions. Completed after day-end is NOT counted as daily throughput. Not calibrated to any real terminal; no construction feasibility or CAPEX conclusion.

WHAT A DIRECTOR SHOULD ASK NEXT

The service target may not be met — even if the yard is larger.

Our example facility shows a real shortfall against the daily service target. Your layout, equipment, occupancy and arrival profiles may behave differently. Let us test your terminal.

  • Which assumptions would reverse the recommendation?
  • What happens at a peak, during an equipment outage, or with higher occupancy?
  • What would this choice cost over the operating life?
Scope this decision for my terminal ↗
Integrated road & rail access
RAIL APPROACHBUFFER PARKINGGATE CHECKTERMINAL YARDAppointment & driver information • Parking • Check-in • Yard services
01Pre-advice
02Parking
03Driver pass*
04Gate check
05Yard service

*Digital driver passport is a proposed process concept, not an implemented software module.

03 / Beyond the yard

The terminal begins before the gate.

Queueing, document checks, parking, appointment windows and rail arrivals are part of one operating system. Their design matters just as much as the size of the storage yard.

  • Compare manual and pre-advised check-in processes.
  • Estimate gate lane requirements under peak conditions.
  • Examine parking buffers and truck-arrival concentration.
  • Define railway reception and handover responsibilities.
  • Specify the future driver information and identity journey.

Scope rule: gate capacity and waiting time require a separately validated study; no gate forecast is calculated on this page. Driver-passport and organisation elements are expert design concepts, subject to implementation review.

04 / Evidence before investment

Test the operating decision.

Compare completed jobs, late completions, unfinished work, rehandles and full-run energy and model cost. These outputs come from executed examples. Financial benefits for your terminal require your own cost structure and operating evidence.

Inspect model assumptions ↗
05 / From problem to board-ready decision

We deliver a decision case, not just a simulation run.

A structured engagement turns an operational question into assumptions, alternatives, verified analysis and recommendations that can be challenged.

01 / FRAME

Define the decision

What choice must be made, who owns it and which trade-offs are acceptable?

02 / EVIDENCE

Inspect inputs

Volumes, arrival patterns, geometry, equipment, time studies, costs and constraints.

03 / DESIGN

Build alternatives

Comparable configurations, scenarios, disturbances and defensible controls.

04 / TEST

Run and validate

Reproducible calculations or simulations, checks, sensitivities and uncertainty.

05 / EXPLAIN

Quantify consequences

Service levels, operational effects, cost scope, breakpoints and alternatives.

06 / DECIDE

Recommend the next step

Executive-ready options with limitations and conditions for implementation.

06 / What you actually receive

Useful outputs for operations and investment teams.

We can structure the engagement around an operational review, feasibility screening, scenario study or a focused pilot.

A compact executive decision brief

  • The question, baseline and proposed alternatives
  • Input assumptions and data limitations
  • Operational KPIs and cost implications
  • Sensitivity to workload, peaks and disturbances
  • Recommended option or required further evidence

A transparent technical evidence pack

  • Documented scenario specifications and units
  • Versioned configurations and reproducible outputs
  • Definitions of every performance indicator
  • Quality checks, exceptions and uncertainty
  • Follow-up experiments or engineering requirements
The offer / Terminal Decision Review

Not a software demo. A decision you can defend.

We start from the question your investment committee or operations team must answer. The exact scope depends on the decisions, data and model validity—not on a generic dashboard package.

Request a study outline ↗
01 / DEFINE

Decision framing

Clarify what is at stake, what must be compared, which data exist and what would count as a useful result.

Output: agreed analysis question and proposed scope
02 / TEST

Comparable alternatives

Assess a baseline and feasible options against the same workload, service target, constraints and documented assumptions.

Output: operational KPIs, sensitivities and cost drivers
03 / DECIDE

Executive decision pack

Show where evidence supports an option, where trade-offs remain and what needs validation before capital is committed.

Output: recommendations and decision conditions
What you are buyingExpert judgement supported by reproducible analysis — not source-code access, automated certainty or a guaranteed saving.
See the output before commissioning a study.

Review a one-page executive decision memo based on the same synthetic terminal example used in this site.

View example decision memo ↗

Analysis led by Mateusz Zając, combining intermodal terminal research and applied industrial project experience. Client-specific claims require verification.

07 / Full study portfolio

21 questions. One disciplined way of testing them.

Below is the wider analytical catalogue. These are proposed study types; their availability depends on model coverage, operator data and project-specific validation.

01. Terminal design and investment 4 studies
  • D1 — Yard and track layouts
  • D2 — Fleet size and equipment mix
  • D3 — Occupancy and growth sensitivity
  • D4 — Road and rail interface design
02. Capacity and expansion 4 studies
  • C1 — Demand growth and capacity ceiling
  • C2 — Peak demand versus daily totals
  • C3 — Extra machine or operating policy
  • C4 — Rail / road traffic mix
03. Disruption and recovery 4 studies
  • R1 — Equipment outage at peak
  • R2 — Disruption duration
  • R3 — Failure at different demand levels
  • R4 — Recovery prioritisation
04. Yard and handling 4 studies
  • Y1 — Storage allocation
  • Y2 — Equipment dispatch policies
  • Y3 — Sharing equipment across flows
  • Y4 — Energy and operating cost trade-offs
05. Gate, access and driver experience 5 studies
  • G1 — Number of road gate lanes
  • G2 — Appointment windows and pre-advice
  • G3 — Parking buffer sizing
  • G4 — Driver passport and communication concept
  • G5 — Train reception and rail access
08 / Operational excellence by design

A terminal is an operating organisation, not only a layout.

Layouts and machines do not guarantee a stable operation. Responsibilities, escalation rules, handovers, driver communication and performance reviews are part of terminal design.

Operational standards

Define roles, dispatching rules, handover points and exception handling before mobilisation.

Shift-to-shift continuity

Establish information flows, recovery triggers, ownership of open jobs and escalation pathways.

Driver and rail stakeholder experience

Connect pre-advice, check-in, documentation, train reception and status communication.

Evidence discipline

Distinguish measured results, validated simulations, simple analytical estimates and future system concepts.

One decision. A concrete next step.

Before you approve the next change, test the alternatives.

Tell us the decision you need to make. We can propose a focused scope and the minimum information needed to start — no requirement to share confidential operational data in a first email.

The contact button opens an email draft. The public-facing contact remains email-based. Optional analytics records only selected usage events after consent; no session replay or confidential inputs are collected. Demo privacy information.

Choose my decision and request a study outline ↗