Choose daily demand
The live engine uses an approved synthetic fixture for each workload. The verified archive below remains a separate record of completed reference runs.
100 requests · Small layout · Uniform arrivals · 2 handling machines.
Adjust three policy signals
The full model evaluates dozens of placement, equipment and flow elements. This public demo exposes three representative weights only.
Explore what was actually completed.
Choose a workload above. These are completed runs of the original terminal_sim-LM engine on synthetic inputs, not instant estimates. They remain accessible whether or not the private live workstation is online. Results never substitute for a study of your terminal.
100 requests · Small · 2 machines
Green: finished by day-end · Amber: finished later · Rust: still unfinished at full-run end. The last two groups together are the day-end shortfall.
What exactly has been calculated?
Results reflect executed synthetic simulations, not a calibrated forecast for a real intermodal terminal. This transparency is essential to interpreting their meaning.
Handling requests, not theoretical capacity
Exactly 100, 200 or 500 discrete container-handling requests. Completed and not completed counts always add up to the requested volume at the day deadline.
Day-end is a hard cutoff
Work completed after midnight is reported separately. Full-run completions must never be described as completed during the operating day.
Fixed resources in each example
100/day uses Small + 2 machines; 200/day uses Medium + 3 machines; 500/day uses Large + 4 machines. The first two have uniform arrivals; 500/day has a mixed peak profile.
Three conceptual storage configurations
Small: 1,200 nominal slots; Medium: 2,520; Large: 5,040. Each is paired with one workload and machine package. Initial inventory arrangement also changes.
Three public controls, dozens of model elements
The public view exposes stacking tier, yard-centre distance and departure-order conflict. The engine still evaluates the full documented policy and operating inputs.
Engine run, not client validation
Real terminal_sim-LM execution produced the executive PDFs. Input data are synthetic; machine, cost and schedule assumptions are not calibrated to your site.
Explore the broader decision laboratory — five topic areas, 21 study questions, simulation concepts, comparison frameworks and executive reporting.
Compute this example
When the owner-operated private workstation is online, this sends only the approved synthetic fixture choice and bounded weights. It runs the original terminal_sim-LM engine; no estimate replaces the calculation.
Checking availability. Nothing is queued until you press the button.
Completed and not completed within the operating day
Your terminal may behave differently.
These are educational examples on synthetic inputs—not investment forecasts for a specific site. Tell us what decision your team needs to make; we will discuss a tailored Terminal Decision Review.